Select Page

Minister of Public Works and Public Housing (PUPR), Basuki Hadimuljono accompanied by the Inspector General of the Ministry of PUPR, Rildo Ananda Anwar, Director of Building Arrangement at the Directorate General of Human Settlements, Anjar Prajudi, President Director of the Gelora Bung Karno Complex Management Center, Winarto and the Implementing Contractor reviewed the renovation developments at some venue at the Bung Karno Complex, namely the Main Stadium, Swimming Stadium and Kridaloka Gelora Bung Karno (8/8). The purpose of this physical checking activity is to ensure that renovations are carried out according to the plan and the quality of item Work in accordance with the standards set by Olympic Committee of Asia as the organizer of the Asian Games activities. The physical check begins by visiting several GBK Main Stadium item the work checked includes the quality of the seat (Single seat), Sound, grass Zoyzia Matrella (linn) merr And grass watering systems use Rain gun, Execution of athletic track work and some item Other work. Overall renovation work at the Main Stadium has reached 82%.

The visit of the Minister of PUPR continues by visiting the Swimming Stadium which is currently entering the completion or closing stages of the Swimming Stadium, checking on the physical work of checking the installation of panels and Liner pool Water polo, the pool panel, the beautiful diving pool and the heating pool workmanship. Overall the renovation of the Swimming Stadium has reached 75%. The Minister of PUPR and the group also reviewed the development of the regional structuring project at Kridaloka GBK, checking item the work done is concrete installation Porous Which will substitute later paving block, Excess of concrete Porous it is concrete pores can absorb water in seconds. Concrete installation work Porous this is the largest installation in the world today.